The Overtime Maximum tab is enabled if the deduction or benefit calculation is based on a Flat Percent. The Available list box contains all hours codes. If any of these codes should count toward an overtime maximum calculation, move them from the Available to the Selected list box. The hours codes selected here also must be selected on the Hours Codes tab.